Colorado Backcountry: “Red Fox” aka BC Hilton - Part 2 - 07.20.2007

We got some major work done on the cabin this week, but I broke a fukkkkking window already! Got a good amount of the roof done, sealed the roof, built supports for the loft and bunks are set. Installed two windows, added frames on the inside of the new windows, new supports for the front half of the cabin, and framed out the front door.